All
East
West
North
South
Our Projects
Nova Air: Sri-City, Andhra Pradesh-220 TPD ASU (2021)
  • ASU
  • COLDBOX ASSEMBLY & ERECTION
  • FBT FABRICATION & ERECTION
  • STATIC & ROTARY EQUIPMENT ERECTION & ALIGNMENT
  • PIPING
  • STRUCTURALS
Linde: IAPL,Modinagar,Uttar Pradesh-200 TPD ASU (2019-20)
  • Flat Bottom Tank - 1000 MT Fabrication/Erection
  • Column Erection
  • Cold Box Structure Erection (Stick-Built)
  • All Rotating Equipment Erection
  • All Static Equipment Erection
  • All structural Fabrication/Erection
  • All inter-connecting CS/SS piping Fabrication/Erection
Linde: IAPL,Ahmedabad,Gujarat-200 TPD ASU (2018-19)
  • Flat Bottom Tank - 1000 MT Fabrication/Erection
  • Column Erection
  • Cold Box Structure Erection (Stick-Built)
  • All Rotating Equipment Erection
  • All Static Equipment Erection
  • All structural Fabrication/Erection
  • All inter-connecting CS/SS piping Fabrication/Erection
Linde: ITC ,Bhadrachalam,Andhra Pradesh-100 TPD ASU (2016-17)
  • Flat Bottom Tank - 500 MT Fabrication/Erection/Erection
  • Column Erection
  • Cold Box Structure Erection (Stick-Built)
  • All Rotating Equipment Erection
  • All Static Equipment Erection
  • All structural Fabrication/Erection
  • All inter-connecting CS/SS piping Fabrication/Erection
JSPL ,Odisha: 100 TPD VPSA (2014-15)
  • Dismantling of VPSA Oxygen Plant at Barabil, Odisha
  • Relocation to Raigad, Odisha
  • Assembly and erection at Raigad, Chhattisgarh
Linde:JSW,Dolvi,Maharashtra:1000 TPD,ASU (2012-13)
  • Modifications
  • Revamping of ASU piping
  • Cold box
Linde:BSL,Angul,Odisha:1000 TPD, ASU (2011-12)
  • ASU Column Erection
  • Assy and Alignment
  • Inter connection Piping for ASU